Gas generators need to make a series of preparations before operation to ensure that the unit can operate safely and stably. Here are some key things to do before you run:First, the operator prepares Professional training: 
Gas generator
一、Operators should receive professional training to understand the structure, performance and safe operation procedures of Gas generators to ensure that they can operate the units correctly and safely.
 
二、 Status inspection of Gas generators
1. Fuel supply inspection:Open the fuel gas supply regulator valve of the Gas generator, check and adjust the pressure of the regulator outlet (usually about 30kPa).Check whether there is gas leakage at each connection and valve.Ensure that the gas pressure is stable and meets the requirements of the unit, and regularly check the gas pipelines, valves and filters to prevent gas leakage or impurities from entering.
2. Oil and filter inspection:Check the oil level to make sure the oil is halfway between ADD and FULL on the oil scale.Regularly change the Gas generator oil and oil filter to keep the oil system clean and functioning properly.
3. Coolant inspection:Check the coolant level to make sure you have enough coolant.Replace the coolant regularly and clean the cooling system to keep it clean and efficient.
4. Inspection of the electrical system of the gas generator set:Check the integrity of electrical components such as cables, terminals, switches, etc.Make sure there are no exposed wires or loose joints, and regularly test the voltage, current, and frequency of the electrical system.
Gas generator
三、Preparation before starting Close the generator battery switch: After confirming that all checks have been completed and correct, close the generator battery switch.Start the generator: Start the unit according to the procedures specified in the operation manual, and pay close attention to the operating status of the unit. If there is any abnormality, it should be stopped immediately for inspection.
 
Before operation, Gas generators need to prepare operators, unit status inspection, environmental and safety inspection, pre-start preparation, operation monitoring and recording and a series of other matters. These preparations ensure safe and stable operation, extend the life of the unit, and reduce the failure rate.
More information about Huaquan Power:https://hq-power.net/
Huaquan official website:https://www.huaquanpower.com/
 
 
【Hot news】
  Sales hotline: +8615905360672     Email address: huaquan@huaquanpower.com
  WhatsApp: +8615905360672        Official website: https://www.huaquanpower.com