As an important backup power source for financial institutions, Bank generator require strict operating procedures to ensure good performance, uninterrupted service, and personnel safety.
1、Pre-Operation Checks of Bank Generator
Visual Inspection: Examine the bank generator for fuel/oil leaks, loose connections, or physical damage before activation.
Fuel Verification: Confirm adequate diesel levels (minimum 75% capacity) without overfilling.
Ventilation: Ensure the generator room has functional airflow systems to prevent carbon monoxide buildup.
2、Operational Guidelines
Start the bank generator only after verifying main power grid failure via automatic transfer switches.
Monitor load capacity continuously, keeping usage below 80% of the generator’s rated output.
Document runtime intervals and performance anomalies in maintenance logs.
3、Emergency Protocols of Bank Generator
Immediately shut down the Bank Generator if abnormal vibrations, smoke, or sparking occur.
Prohibit refueling during operation; allow 15-minute cooldown periods before servicing.
Equip the area with Class B fire extinguishers and clearly marked emergency shutoff switches.
4、Post-Operation of Bank Generator
Let the Bank Generator run unloaded for 3-5 minutes before shutdown to stabilize components.
Secure the fuel cap and disconnect batteries during prolonged inactivity to prevent corrosion.
Regular staff training and compliance with these procedures minimize risks while maintaining the Bank Generator reliability during critical power outages.
More information about Bank generator:https://hq-power.net/